Instream habitat improvement and riparian works on the Cummirk in the Finn Catchment are underway. The Riparian Works include the creation of a 1.8km riparian buffer strip with a width of 5m from the water’s edge, and the installation of pasture pumps/offline drinking solutions, stiles & unigates. The 5m buffer will then be planted with approximately 2,450 trees. The instream works will aim to use largely “green” or “soft” engineering measures as bank stabilisation.
Improvement Works on the Cummirk River, Finn Catchment
